AnsweredAssumed Answered

Uploading previously done initialization calibrations to AD9371

Question asked by yeaten on Jul 21, 2017
Latest reply on Aug 4, 2017 by gverma

When I was profiling the code I figured it out that initialization calibrations take out nearly ~2s (runInitCals + waitInitCals). However, I haven't got that much time to power up AD9371. If I am working with fix LO and fix bandwidth, is there a way to save calibration data and upload to AD9371 while power up instead of runnning initial calibrations?

Outcomes