Question
What is the recommended supply sequence?
Answer
The Golden sequence for power up is: Ground, VDD, VSS, Digital Inputs. The
trench isolation and lack of logic supply pin (VL) means that it is not
possible to cause latch-up in these parts by an improper supply sequence.
However, it is still good practice to follow the Golden sequence
whenever possible.