Hello, the AD9361 power FAQ (thread 80731) and UG-570 say VDD_GPO must rise as fast or faster than the 1.3 V supply domain. In our AD9364 design, VDD_GPO (2.7 V from an ADP151 LDO) is enabled by the open-drain power-good of the 1.3 V LDOs, so VDD_GPO only starts ramping after the 1.3 V rails are in regulation (we have not measured the delay yet). The ADALM-PLUTO Rev D does the same: its VDD_GPO is the 3.3 V rail from an ADM7160 whose EN is also driven by PG_1P3V.
1) What is the risk or failure mode if VDD_GPO lags the 1.3 V domain at power-up?
2) Is the Pluto Rev D arrangement considered acceptable by ADI?
3) Would holding RESETB low until VDD_GPO is up remove the concern?
Thank you.
