The success of collected data rate over time highly depends on network. Take a look at some field data from installations in different countries shared on the G3-PLC website:
Progressive Smart Metering Rollout (see page 6 and after).
First Results on G3-PLC roll out (see page 12)
Vienna Three different communication technologiesd tested in Malaysia (see page 9).