Post Go back to editing

Startup Configuration Issue with EVAL-ADIN3310EBZ

Thread Summary

The user inquired about retaining the configuration on the EVAL=ADIN3310EBZ demo board after a power cycle. The switch does not store configurations and must be reconfigured each time. An embedded host can configure the switch on startup in end applications, similar to how the PC acts as the host with the ADI GUI.
AI Generated Content
Category: Software
Product Number: ADIN3310
Software Version: SC0000519-005.329

I am using the EVAL=ADIN3310EBZ demo board with your Windows tsn-evaluation-util to configure the switch. I have been saving the configuration, but when I power cycle the board it does not retain the run configuration and I have to reconnect and reconfigure. Is there a way to have it boot-up and run using a saved configuration after a power cycle?