No, there is no specific power up sequencing requirement. However, care must always be taken not to violate the Absolute Maximum Ratings. The internal power-on-reset (POR) ensure proper re-initialization when supplies drop below certain level, asserting the BUSY pin. No conversion should be initiated through CNV before 1 ms after BUSY goes in a POR event.