Article AD777x: Is there a need for a defined power up sequence?

The AD777x does not have any power sequence requirements. 

The only thing recommended is to make a RESET followed by a SYNC command (via HW or SW) after the supplied voltages are stable to load the default values.

Before You Switch


Switching languages will make ADI Explorer unavailable. Resume your session by switching back to English and reopening ADI Explorer.