In the datasheet it's described: "The IOVDD, VDD12A, VDD12_CLK, and DVDD domains must be powered up first. Then, the VNEG_N1P2, VDD_1P2, PLL_CLK_VDD12, DVDD_1P2, and SYNC_VDD_3P3 can be powered up. The VDD25_DAC domain must be powered up last."
Are there any delay time requirement between these power domains?
For example, after IOVDD, VDD12A, VDD12_CLK, and DVDD domains powered up, how long time should we wait before "the VNEG_N1P2, VDD_1P2, PLL_CLK_VDD12, DVDD_1P2, and SYNC_VDD_3P3 powered up"? Is it okay if it's as short as 500us?